B
          
        
        
          ecause of thedemand for
        
        
          oil and gas, inChina’s Tarim
        
        
          Basin, CNPChas drilled
        
        
          wellswith a record vertical depth
        
        
          of 26 522 ft andwith a record static
        
        
          bottomhole temperature (BHT) of
        
        
          412˚F. Previously used cementing
        
        
          additives canmeet the cementing
        
        
          requirements of conventional
        
        
          wells, but they are usually unable
        
        
          meet the requirements of new
        
        
          cementing jobs because they lack
        
        
          certain features demandedof
        
        
          themby these newwells. For these
        
        
          moredemanding jobs, cementing
        
        
          Zhonghui Liu,
        
        
          Landy Energy Services, Inc.,
        
        
          USA andWei Wang,
        
        
          Landy Energy Services, Inc.,
        
        
          China, detail the
        
        
          characteristics of intelligent
        
        
          temperature adaptable
        
        
          cementing additives (ITACA)
        
        
          for conventional, super HPHT
        
        
          and deepwells.
        
        
          
            |
          
        
        
          
            65